| Design, Fabrication, Supply & Installation of field office buildings for Mechanical maintenance project at Al Zour Refinery | IMCO Engineering Services Co. – (KIPIC) – NRP, Mina Al Zour | Ongoing |
| Dismantling and Demolition of TCF facilities | Sinopec 10- FDH JV – (KIPIC-K031) -NRP, Mina Al Zour | 2022 |
| Dummy trench backfilling and related concreting works | Sinopec 10- FDH JV – (KIPIC-K031) -NRP, Mina Al Zour | 2022 |
| Electrical and Instrumentation works at GC-32 | Sinopec10, Petrofac – KOC- GC32 project | 2022 |
| Communication duct bank, hand holes and other underground structures, and road works | MASAR Al-Kuwait Co. – Leonardo Company – Ali Al Salem Air Force Base | 2022 |
| Storm water & Sewage Line Construction | Alghanim International – Leonardo Company- Ali Al Salem Air Force Base | 2022 |
| Design, Fabrication, Supply & Installation of main office building & facilities for Mechanical maintenance project at Al Zour Refinery | IMCO Engineering Services Co. – (KIPIC) – NRP, Mina Al Zour | 2022 |
| Design, Fabrication, Supply & Installation of field office buildings for E&I maintenance project at Al Zour Refinery | FAWAZ Trading & Engineering Services W.L.L – (KIPIC) – NRP, Mina Al Zour | 2022 |
| Stenciling and Insulation works | Tecnicas Reunidas – (KIPIC) – NRP, Mina Al Zour. | 2021 |
| Thermal Insulation work | Sinopec 10 – FDH JV – (KIPIC-K031) -NRP, Mina Al Zour | 2021 |
| Steel works at Ground Floor Façade work | Impressa Pizzarotti – Italy, New Maternity Hospital Project | 2021 |
| Concrete Trench works | Impressa Pizzarotti – Italy, New Maternity Hospital Project | 2021 |
| Concrete Pedestal Works | Impressa Pizzarotti – Italy, New Maternity Hospital Project | 2021 |
| Installation of Ceramic Tiles | Impressa Pizzarotti – Italy, New Maternity Hospital Project | 2021 |
| Cable Trench Excavation, Street light Foundation work | Flour, Sinopec10 JV – (KIPIC-K031)-NRP, Mina Al Zour | 2021 |
| Civil works at GC-32 | O&G Engineering, Petrofac – KOC – GC32 project | 2021 |
| Box Culvert Cutting and Plugging works | Impressa Pizzarotti – Italy, New Maternity Hospital Project | 2021 |
| Modification works for Beam Support at Ground floor | Impressa Pizzarotti – Italy, New Maternity Hospital Project | 2021 |
| Design, Fabrication, Supply & Installation of main office building & facilities for E&I maintenance project at Al Zour Refinery | FAWAZ Trading & Engineering Services W.L.L – (KIPIC) – NRP, Mina Al Zour | 2021 |
| Concrete Upstand Works | Impressa Pizzarotti – Italy, New Maternity Hospital Project | 2021 |
| Column-Lintel Concrete Works | Impressa Pizzarotti – Italy, New Maternity Hospital Project | 2021 |
| Refractory Installation works | Sinopec10, Petrofac – GC32 project | 2020 |
| Erection & Dismantling of Scaffolding work | Tecnicas Reunidas, Sinopec5, Hanwha JV – (KIPIC) – NRP, Mina Al Zour. | 2020 |
| Valve and Flange box Insulation work | Tecnicas Reunidas, Sinopec5, Hanwha JV – (KIPIC) – NRP, Mina Al Zour. | 2020 |
| 4000Tons Steel structure Erection works including Coating, Blasting & Erection at New Refinery Projects at Mina Al Zour | Tecnicas Reunidas, Sinopec5, Hanwha JV – (KIPIC) | 2019 |
| Steel Structure Modification works | Tecnicas Reunidas, Sinopec5, Hanwha JV – (KIPIC) – NRP, Mina Al Zour. | 2019 |
| 600 Ton Steel Structure Erection works of GC-32 Gathering Centre Project | Sinopec10, Petrofac – GC32 project | 2019 |
| Pipe support | Tecnicas Reunidas, China Eleventh Chemical Costruction Co. LTD – (KIPIC) | 2019 |
| Cladding work | Tecnicas Reunidas, Sinopec5, Hanwha JV – (KIPIC) – NRP, Mina Al Zour | 2019 |
| Fabrication of temporary facility and workers accommodation | Sinopec 10 – LFHOD Project Abdally (KOC) | 2019 |
| Construction and Fabrication of site office at New Refinery Package 1 | Tecnicas Reunidas, China Eleventh Chemical Construction Co. LTD – (KIPIC) | 2019 |
| Complete Camp Construction for 1500 people at New Refinery Projects Package 1 | Tecnicas Reunidas, China Eleventh Chemical Construction Co. LTD – (KIPIC) | 2019 |
| Electrical & Instrumentation contract works at New Refinery Projects at Mina Al Zour | Tecnicas Reunidas, Sinopec5, Hanwha JV – (KIPIC) | 2019 |
| Electrical & Instrumentation contract works at New Refinery Projects at Mina Al Zour | Tecnicas Reunidas, China Eleventh Chemical Construction Co. LTD – (KIPIC) | 2019 |
| Warehouse Construction and Laydown Earthwork | Sinopec10, Petrofac – GC32 project | 2019 |
| Site Office Construction and Land Preparation works | Sinopec10, Petrofac – GC32 project | 2019 |
| Site Office Construction and Land Preparation works | Khalid Al Kharafi, Petrofac – GC32 project | 2019 |
| Site Office and Warehouse construction | Flour, Sinopec10 JV – (KIPIC-K031)-NRP, Mina Al Zour | 2019 |
| Land Preparation works | Flour, Sinopec10 JV – (KIPIC-K031)-NRP, Mina Al Zour | 2019 |
| Civil & Fabrication works at New Maternity Hospital Project | Pizzarotti – Italy | 2018 |
| Civil & Fabrication works for Mina Al Zour new Power station | MEW/SEPCO III Electric Power Construction Corporation | 2018 |
| Construction and Fabrication of Temporary Facilities works for SINOPEC Fifth Construction Co. LTD at KNPC Al Zour New Refinery Project | KNPC / Tecnicas Reunidas, Sinopec5, Hanwha JV | 2018 |
| Substation and Tower Crane Foundation works | Pizzarotti – Italy, New Maternity Hospital Project | 2018 |
| Fabrication of Portable cabins & Management Accommodation | KNPC / Tecnicas Reunidas, Sinopec5, Hanwha JV | 2017 |
| Fabrication of Chinese Mess Hall, Foreign Mess Hall & Kitchens | KNPC / Tecnicas Reunidas, Sinopec5, Hanwha JV | 2017 |
| Construction of Asphalt road for SINOPEC Fifth Construction Co.Ltd at KNPC Al Zour New Refinery Project | KNPC / Tecnicas Reunidas, Sinopec5, Hanwha JV | 2017 |
| Construction & Fabrication of Warehouse building for Tecnicas Reunidas at Mina Abdulla TR GT 5 Project | Tecnicas Reunidas / BAT EMAN | 2016 |
| Construction & Fabrication of Admin Office building for Tecnicas Reunidas at Mina Abdulla TR GT 5 Project | KNPC / Tecnicas Reunidas, Sinopec5, Hanwha JV | 2016 |
| Fabrication of T7 WASH BAY | Gulf Spic / Al Hajran | 2016 |
| Fabrication of T2 Vehicle Maintenance Building | Gulf Spic / Al Hajran | 2016 |
| Fabrication of Medical Facilities for Saipem for NRP Project | Saipem / Al Hajran | 2016 |
| Fabrication of Gantry and Car parking | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2015 |
| Concrete cutting & Core Drilling of box culverts | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2015 |
| Construction of manhole & Thrust blocks | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2015 |
| Construction of Precast Boundary – General Department of Customs | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2015 |
| Demolition of Pedestrian bridge near Shuwaikh port | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2015 |
| Utility Protection under the roads | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2015 |
| Airport road bridge demolition near KOTC building | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2015 |
| Fabrication of Temporary Facilities site Office #2 | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2014 |
| Soil & Asphalt Transportation | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2014 |
| Construction of Precast boundary – Ministry of Social Affairs | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2014 |
| Installation of single face barriers | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2013 |
| Construction of Precast Boundary – Ministry of health | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2013 |
| Construction of Navy Fleet Camp | US Navy Mina Salman – Bahrain | 2012 |
| Installation of chain link fence and Kirby Fence (approx. 14km) | OHL RIZZANI JV (JAMAL ABDEL NASSER STREET PROJECT) | 2011 |
| Construction of Warehouse, Burgan | Baker Hughes Kuwait | 2011 |
| Installation of Kerbs and Paving, Ahmadi | EFS, Kuwait | 2011 |
| Construction of camp facility | Gulf Spic | 2011 |